When the objection period opens it will be the only chance to have a say. There is no appeal afterwards.
Save the Doreen ValleyMiddle Hut BESS

This valley is quiet. They plan to change that.

A 14-hectare battery plant is proposed for these paddocks at Middle Hut Road, Doreen. The objection period is the only say we get.

Looking across the valley at Middle Hut Road, Doreen

14 haof batteries and electrical plant
290 MWoperating day and night
Nonenoise levels published
2 or 3permanent local jobs

These paddocks have been grazed for generations. The plan is to fill fourteen hectares of them with batteries, transformers and a 220 kV terminal station, running around the clock until about 2050.

Three reasons residents are objecting

What it would do to this valley

1

The noise never stops

The developers name the source themselves: inverters and cooling fans. They run through the night, when there is nothing out here to cover them.

Read about the noise →
2

We look down onto it

The only screening proposed is planting along the fence line. That does nothing for a house on higher ground looking down.

Read about the view →
3

Nobody can appeal it

The Minister decides and the Council can only comment. Once it is decided there is no appeal, for anyone.

Object while you can →
There are no third-party appeal rights for either Council or the community in relation to the Minister's decision under this process. Nillumbik Shire Council, 20 August 2026

No second hearing, no tribunal, no review. What residents put in writing is the entire record of what this community said.

The shape of it

Fourteen hectares, on the floor of the valley

Cross-section of the valley showing homes above the proposed battery site Houses sit on high ground at the left. Lines of sight run down to a block of battery containers and a terminal station on the valley floor, about 14 hectares wide, with a transmission tower on the far rise. Homes above the valley About 14 hectares of plant 220 kV terminal station existing power lines line of sight
A schematic drawing, not a survey — no structure heights have been released, so the true size cannot yet be drawn. Figures from Nillumbik Shire Council, 20 August 2026.
The part that should worry everyone

Eight things the developers have not published

All of it is due to appear during the objection period — the same short window in which we have to answer it.

  • ✕Expected noise level at the nearest house
  • ✕Distance from the plant to the nearest house
  • ✕The acoustic report
  • ✕Heights of the buildings and equipment
  • ✕Any image of how it would look
  • ✕The bushfire and fire safety assessment
  • ✕Existing night-time noise levels in this valley
  • ✕How many battery units, inverters and transformers

Where this is up to

Three steps are already done, and residents were not part of any of them.

Early 2026Site chosenBeside the existing power lines.
Aug – Sep 2026Developers consultedLetters and one drop-in session.
September 2026Application lodgedWith the Minister, not the Council.
Date not yet announcedThe objection periodWe are hereShort, and opens with little warning.
End of 2026The Minister decidesNo appeal, by anyone.

It takes a few minutes, and it is the only thing that counts.

Leave your details and we will email you the moment the objection period opens.

How to object